GD NASSCO Awarded $736M to Build T-AO 213
Stay informed with our
free newsletters

This news is classified in: Defense Contracts Navy

May 24, 2023

GD NASSCO Awarded $736M to Build T-AO 213

  • Contract modification exercises the option for previously awarded contract for the construction of T-AO 213

General Dynamics NASSCO, a subsidiary of General Dynamics (NYSE: GD), announced today that it has been awarded a $736 million modification to the existing T-AO contract for construction of a ninth ship (T-AO 213) in the John Lewis-class fleet oiler program. The exercised option comes in addition to the earlier awarded eight ships, bringing the total contract value to approximately $5.5 billion for construction of nine ships.

“NASSCO is proud of our ongoing dedication to deliver these ships to the fleet,” said Dave Carver, President of General Dynamics NASSCO. “We are committed to working with our Navy partners to ensure the continued success of the John Lewis-class fleet oiler program.”

Construction of T-AO 213 is scheduled to begin in the third quarter of 2025.

Undersea Warfare Systems Market - Global Industry Size, Share, Trends, Opportunity, and Forecast, 2019-2029F

Undersea Warfare Systems Market - Global Industry Size, Share, Trends, Opportunity, and Forecast, 2019-2029F

By Type (Weapon Systems, Communication and Surveillance Systems, Sensors and Computation Systems, Countermeasure Systems and Payload, Unmanned Underwater Vehicles), By Mode of Operation (Manned Operations, Autonomous Operations, Remotely Operations), By Application (Combat, C4ISR, Others), By Region, Competition, 2019-2029F

Download free sample pages

In 2016, the Navy awarded NASSCO with a contract to design and build the first six ships in the next generation of fleet oilers, the John Lewis-class (T-AO 205), previously known as the TAO(X). Designed to transfer fuel to U.S. Navy carrier strike group ships operating at sea, the 742-feet vessels have a full load displacement of 49,850 tons, with the capacity to carry 157,000 barrels of oil, a significant dry cargo capacity, aviation capability and up to a speed of 20 knots. The first ship, the future USNS John Lewis (T-AO 205), was delivered to the Navy last year. The future USNS Harvey Milk (T-AO 206), the future USNS Earl Warren (T-AO 207), the future USNS Robert F. Kennedy (T-AO 208), the future USNS Lucy Stone (T-AO 209), and the future USNS Sojourner Truth (T-AO 210) are currently under construction.


General Dynamics NASSCO
View original News release