GKN Aerospace Receives Order for Swedish Future Fighter Powe
Stay informed with our
free newsletters

Mar 25, 2024

GKN Aerospace Receives Order for Swedish Future Fighter Power and Propulsion Concept Studies

GKN Aerospace has received an order from the Swedish Defence Materiel Administration (FMV) to develop conceptual studies for advanced power and propulsion systems to support future fighter systems. The agreement runs for two years, from 2024 to 2025, with the potential for a follow-on phase beyond.

The contract covers conceptual studies of power and propulsion systems for the next-generation of combat air capabilities, based on exploring both existing and future technology and performing demonstrations. GKN Aerospace will collaborate closely with the Swedish Armed Forces, FMV, FOI, Saab and other national and international industry partners.

The studies will help create the foundation for future fighter systems and continue the path of innovative Swedish-developed fighter systems.

Global Military Fixed-Wing Aircraft - Market and Technology Forecast to 2027

Global Military Fixed-Wing Aircraft - Market and Technology Forecast to 2027

Market forecasts by Region, Platform, and Propulsion type. Country analysis, Current Market Overview, Opportunity analysis, and Leading Company profiles

Download free sample pages More information

GKN Aerospace will seek and develop collaboration with partners working with a range of power and propulsion systems and disruptive technologies, which are expected to play an important role for any future air combat capability.

"GKN Aerospace is a world-leader in engine systems and a design partner for the world’s most successful commercial engines. We are also the OEM capability for the JAS 39 Gripen C/D RM12 engines worldwide and are continuing to establish the product support capability for the RM16 engine, powering the JAS 39 Gripen E. This contract will enable us to further strengthen our capability and support our customers with necessary data for future combat air capabilities." Stefan Oscarsson, Vice President Governmental Solutions at GKN Aerospace

Alongside these studies, GKN Aerospace has entered a new cooperation agreement with Saab to strengthen their partnership developing innovative solutions across a range of areas, including next-generation fighter systems.

Stefan Oscarsson added: “We are extremely proud of our role in the Swedish defence ecosystem. GKN Aerospace is currently upgrading the RM12, delivering additional engines for the Gripen aircraft to Hungary and establishing engine product support for the Gripen E. The Gripen will continue to be the backbone of Sweden and several other nations’ air forces for decades to come and we will continue to ensure availability for our customers.”

Trollhättan, in Sweden, is also GKN Aerospace’s centre of excellence for ground-breaking additive fabrication technology, which was recently bolstered by a £50m investment in the capability. The new production capabilities will enable the business to industrialise its additive fabrication solutions, lower environmental impact, and to meet the requirements of future generations of power and propulsion systems.



Defence Exports 2024 Conference

Defence Exports 2024 Conference

London, United Kingdom
Sep 24 - 25, 2024

View agenda
DoD Energy & Power Summit

DoD Energy & Power Summit

Washington, DC
Jul 31 - Aug 1, 2024

View agenda