Fincantieri Delivers Upgraded OPV P61 to Armed Forces of Mal
Stay informed with our
free newsletters

Fincantieri Delivers Upgraded OPV P61 to Armed Forces of Malta

Fincantieri delivered Offshore Patrol Vessel P61 to the Armed Forces of Malta, following upgrading activities carried out at the Group’s drydocking facility within the Port of Genoa.

The aim of the works, which lasted about 6 months, was to improve the reaction capability of the vessel. The upgrade included the installation of a new main propulsion plant, other machinery and equipment as well as the overhaul of most of the ship’s on board systems.   

Offshore Patrol Vessel P61 is over 53 meters long and was built and delivered by Fincantieri’s shipyard of Muggiano to the Armed Forces of Malta in 2005. It is a modified variant of the “Diciotti” Class Patrol Boat, built by Fincantieri for the Italian Coast Guard.

Turret System Market Report: Trends, Forecast and Competitive Analysis to 2031

Turret System Market Report: Trends, Forecast and Competitive Analysis to 2031

Key data points: The market size in 2031 = $22.4 billion, growth forecast = 2.5% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global turret system market to 2031 by platform (land, naval, and airborne), type (manned turret and unmanned turret), component (turret drive, turret control, and stabilization unit), and region (North America, Europe, Asia Pacific, and the Rest of the World)

Download free sample pages

The upgrading project was co-financed by the European Union Internal Security Fund.


Publishdate:
Nov 28, 2017

Digital Engineering for Defense Summit 2025

Digital Engineering for Defense Summit 2025

Washington, DC
Jun 25 - 26, 2025

View agenda
Seabed Security Conference 2025

Seabed Security Conference 2025

Troia, Portugal
Sep 30 - Oct 1, 2025

View agenda