Air Force, Boeing agree on final KC-46 RVS 2.0 design
Stay informed with our
free newsletters

Apr 3, 2020

Air Force, Boeing agree on final KC-46 RVS 2.0 design

By Secretary of the Air Force Public Affairs / Published April 02, 2020

ARLINGTON, Va. (AFNS) -- The Air Force and Boeing reached two agreements April 2 to implement a final KC-46A Pegasus Remote Vision System design, known as RVS 2.0, and help counter COVID-19 impacts on the defense industrial base.

The two Memorandums of Agreement (MOA) will be incorporated in the KC-46 contract.

Fuel Cells In Aerospace & Defense Market - Global Forecast 2024-2030

Fuel Cells In Aerospace & Defense Market - Global Forecast 2024-2030

by Product (Alkaline Fuel Cells, Direct Methanol Fuel Cells, Molten Carbonate Fuel Cells), Application (Aerospace, Military)

Download free sample pages

The first MOA institutes the redesign and retrofit of RVS 2.0 in full compliance with the contract requirements at no additional cost to the government. This agreement addresses deficiencies that hindered safe and effective refueling operations.

RVS 2.0 will include 4K color cameras with proper viewing geometry, operator stations with larger screens, a laser ranger for refueling aircraft distance measurement and boom assistance augmented reality. With the help of scientists and engineers from both enterprises, the Air Force will lead design reviews and approve specifications to drive the partnership toward initial fielding in 2023.

The second and separate MOA acknowledges possible impacts of the COVID-19 outbreak on our nation and the defense industrial base, and releases previously withheld contract payments to help ensure successful performance under the program.

This agreement provides Boeing $882 million of withheld payments for previous non-compliance in 33 KC-46 deliveries.

This withhold release is in line with Department of the Air Force and Department of Defense policies to maximize cash flow, where prudent, to combat coronavirus impacts on the industry base. Within 120 days, the Air Force and Boeing will conduct an expedited process to determine final specification compliance or non-compliance.

The Air Force and Boeing are committed to delivering a fully-operational tanker to the warfighter and ensuring the continued viability of an essential member of the defense industrial base.



DoD Energy & Power Summit

DoD Energy & Power Summit

Washington, DC
Jul 31 - Aug 1, 2024

View agenda
Digital Engineering for Defense Summit 2024

Digital Engineering for Defense Summit 2024

National Harbor, MD
Jun 26 - 27, 2024

View agenda