Huntington Ingalls Industries' Use of Digital Technology Dri
Stay informed with our
free newsletters

This news is classified in: Defense Navy

Sep 28, 2018

Huntington Ingalls Industries' Use of Digital Technology Drives Latest Construction Milestone For Aircraft Carrier John F. Kennedy

NEWPORT NEWS, Va. (Sept. 28, 2018)--An improved build strategy, which includes the use of digital technologies to improve efficiencies, has allowed Huntington Ingalls Industries’ (NYSE:HII) Newport News Shipbuilding division to reach another milestone in the construction of the aircraft carrier John F. Kennedy (CVN 79).

The company on Friday lowered the final piece of the ship’s underwater hull into place. The joining of the 726-ton lower bow, which includes the distinctive bulbous feature, completes the section of the ship below the waterline and extends the nuclear-powered warship an additional 122 feet.

At 1,096 feet, Kennedy’s hull is longer than three football fields.

Undersea Warfare Systems Market - Global Industry Size, Share, Trends, Opportunity, and Forecast, 2019-2029F

Undersea Warfare Systems Market - Global Industry Size, Share, Trends, Opportunity, and Forecast, 2019-2029F

By Type (Weapon Systems, Communication and Surveillance Systems, Sensors and Computation Systems, Countermeasure Systems and Payload, Unmanned Underwater Vehicles), By Mode of Operation (Manned Operations, Autonomous Operations, Remotely Operations), By Application (Combat, C4ISR, Others), By Region, Competition, 2019-2029F

Download free sample pages

The lower bow is more than 64 feet tall and 54 feet wide and is one of the heaviest planned steel structures, known as superlifts, to be placed on the ship. The unit consists of 84,000 square feet of tanks and chain lockers.

“This superlift completes the underwater hull of the ship and completes the erection of all of the ship’s structures from main deck down,” said Lucas Hicks, Newport News’ vice president, CVN 79 carrier construction. “The lower bow superlift is another good example of how the use of technology is driving how we are building the next generation aircraft carrier.

“This brings us one step closer to launching the ship next year,” Hicks said.

More than 3,000 shipbuilders and 2,000 suppliers from across the country are supporting the construction of Kennedy.

Kennedy’s keel was laid in 2015. The christening is planned for late 2019.


Huntington Ingalls Industries
View original News release