Newsletter Subscription


Tuesday, Sept 26, 2017


US Army and USCG Take Initial Delivery of Varley USA H-60 Bridge Tool Kit

  • New tool solution reduces ''5-Pack'' maintenance hours by 75% while preventing collateral damage to zero-tolerance components

Varley USA , a leading engineering and manufacturing company that specializes in Aerospace and Defense programs, today announced the initial delivery of the new H-60 Bridge Tool Kits to the U.S. Army, Army National Guard, and U.S. Coast Guard.

The H-60 Bridge Tool Kit contains specially designed tools for the removal and installation of “5-Pack” (gearbox, two engine input and two accessory drive modules) components that include forward and aft bridges, bellcranks, tie rods, eccentric bushings, and longitudinal support assemblies on the H-60 helicopter. The H-60 platform includes all models of the Blackhawk (USA), Seahawk/Knighthawk (USN), Pave Hawk (USAF), Jayhawk (USCG) and the White Hawk (USMC, Marine One).


Related Research on ASDReports.com:
Global Military Aviation MRO Market 2017-2027

“Every branch of the service has long sought solutions for improving maintenance processes that increase aircraft availability,” said Bob Hill, former U.S. Army Aviation & Missile Command (AMCOM) Field Operations Division Chief and Field Maintenance Deputy Director. “After conducting on-aircraft demonstrations and discussions with numerous H-60 maintenance technicians and other subject matter experts, the toolkit's quality and its performance are undisputable. This tool enhances our Warfighters’ capabilities by reducing time/effort and by preventing damage to the main transmission, which, ultimately, allows more of our H-60’s to maintain mission readiness.”

By avoiding just one transmission case loss, the Services’ H-60 maintenance can realize more than $500,000 savings in time and parts risk during each transmission 5-pack removal.

“We were able to utilize direct hands-on input from H-60 maintainers to ensure these tools were purpose-built with a goal for zero allowance of collateral component damage,” said Matt Hederstrom, CEO of Varley USA. “We were able to achieve that goal while also helping to improve aircraft availability and reduce total maintenance hours from an average of 64 man-hours to remove 5-pack components to less than nine (9) man-hours per each main transmission disassembly, and achieved a 100% reduction in collateral damage.”

Source : Varley USA, Inc. - view original press release

Published on ASDNews: Aug 23, 2017

 

Disruptive Technology for Defence Conference

Oct 24 - 25, 2017 - London, United Kingdom

Register More info


Military Flight Training Conference 2017

Oct 11 - 12, 2017 - London, United Kingdom

Register More info


ITAR US Defense Trade Controls e-Seminar

Jan 1 - Dec 31, 2017 - USB Drive, Windows Computer

Register More info


© 2004-2017 • ASDNews • be the first to know • contact usterms & conditionsprivacy policyadvertisingfaqs

zpsk