Newsletter Subscription


Tuesday, Oct 21, 2014


Ariane 5 is Readied for Arianespace's September Launch With MEASAT-3b

The Ariane 5 for Arianespace Flight VA218 is shown during transfer, moving on its mobile launch table (photo at left) from the Spaceport’s Launcher Integration Building to the Final Assembly Building (photo at right).

Preparations for Arianespace’s next Ariane 5 mission marked an important milestone this week with the vehicle’s transfer from the Spaceport’s Launcher Integration Building – where it was assembled, to the Final Assembly Building – where the dual-passenger payload will be installed.


Related Research on ASDReports.com:
Global Satellite Transponder Market

This procedure represented the heavy-lift launcher’s formal handover from industrial architect Airbus Defence and Space to Arianespace, which takes responsibility for incorporation of the two commercial telecommunications satellites, along with the Ariane 5’s final checkout and launch operations in French Guiana.

Targeted for a liftoff in September, this mission – designated Flight VA218 in Arianespace’s launcher family numbering system – will orbit MEASAT-3b and Optus 10.

MEASAT-3b was produced by Airbus Defence and Space and is to be operated by MEASAT in supporting direct-to-home broadcast services for Malaysia, India, Indonesia and Australia.  Optus 10 was manufactured by Space Systems/Loral for Australian telecommunications service provider Optus, enabling direct TV broadcast, internet connectivity, telephone and data transmission services for Australia and New Zealand.

Source : Arianespace

Published on ASDNews: Aug 13, 2014

 

Global MilSatCom 2014

Nov 4 - 6, 2014 - London, United Kingdom

Register More info


© 2004-2014 • ASDNews • be the first to know • contact usterms & conditionsprivacy policyadvertisingfaqs